Document Controller
Responsible for the receipt, issue/distribution, storage and archiving of project documentation.
Ensure that all project documents sent or produced on site are correctly registered, distributed, filed and easily retrieved.
Establish and maintain a filing system for all technical documents
Responsible for ensuring that the technical and contract documentation held on site is current and retrievable.
Keeps paper masters of drawings filed in drawing number sequence
Monitor Completion of paper work in systems
Establish and maintain a library system for all documents
Prepare the internal transmittals and external transmittals
Preparation of daily, weekly and monthly reports which reflects the progress of receiving the project documents
Transmittals and letters are filed in sequence
Add the latest revision of documents in records
Proper control of superseded documents / drawings
Maintain the status of Civil, Mechanical, Electrical and Instrumentation documents
Maintain hard copies of all technical records, vendor data and text books
Maintain list of all available documents and drawings
Update necessary technical information for Company’s Intranet program
Update the status of all disciplines on daily and monthly basis
Update and Control the master record
Responsible for the receipt, issue/distribution, storage and archiving of project documentation.
Ensure that all project documents sent or produced on site are correctly registered, distributed, filed and easily retrieved.
Establish and maintain a filing system for all technical documents
Responsible for ensuring that the technical and contract documentation held on site is current and retrievable.
Keeps paper masters of drawings filed in drawing number sequence
Monitor Completion of paper work in systems
Establish and maintain a library system for all documents
Prepare the internal transmittals and external transmittals
Preparation of daily, weekly and monthly reports which reflects the progress of receiving the project documents
Transmittals and letters are filed in sequence
Add the latest revision of documents in records
Proper control of superseded documents / drawings
Maintain the status of Civil, Mechanical, Electrical and Instrumentation documents
Maintain hard copies of all technical records, vendor data and text books
Maintain list of all available documents and drawings
Update necessary technical information for Company’s Intranet program
Update the status of all disciplines on daily and monthly basis
Update and Control the master record